Geothermal Power from Hot Dry Rock

How enhanced geothermal systems work, what Mazama Energy demonstrated at Newberry Volcano, and what the numbers say

Thomas Lee Abshier, ND · 28 November 2026

Introduction

In 2025 a company called Mazama Energy drilled two wells about 10,000 feet into hot rock on the western flank of Newberry Volcano in central Oregon, stimulated the rock between them, and circulated water from one well to the other at a bottomhole temperature of 331 °C (629 °F). That result is a working enhanced geothermal system, built in dry rock that holds no natural reservoir of hot water.

I came to this project through a popular video that told the story well and got the main facts right, but it also stated several things the record does not support. In this article, I explain the physics of geothermal power, describe what was done at Newberry, show why temperature governs the output of such a plant, and list where the video was wrong. I checked each figure against the company’s technical papers, its press releases, trade reporting, and federal energy data. I report and note company projections and actual measurements.

The Heat Beneath Us

The interior of the Earth is hot, and the heat flows outward through the crust by conduction. Two sources supply it: heat left from the planet’s formation, and heat released by the decay of radioactive uranium, thorium, and potassium in the crust and mantle. The total outward flow measured at the surface is about 47 terawatts. For comparison, the whole human economy uses primary energy at a rate of roughly 19 to 20 terawatts.

In the continental crust, the temperature rises on average about 25 to 30 °C per kilometer of depth. At that rate, rock at 3 km is near 80 to 100 °C, and rock hot enough for efficient power generation (above about 200 °C) lies 6 to 8 km down. In volcanic regions the gradient is much steeper because magma sits closer to the surface. At Newberry, rock at 3 km measures 331 °C, an average gradient of about 110 °C per kilometer, roughly four times the continental average.

A geothermal plant does not run on the 47 terawatts of flow. It mines the heat stored in a volume of rock, and the flow from below refills that volume slowly. I return to this point under the open engineering problems, because it governs how long a single well field lasts.

Conventional Geothermal and Its Limit

Conventional (hydrothermal) geothermal power requires three things in one place: hot rock, water in that rock, and enough natural permeability for the water to flow to a well. Where all three coincide, as at The Geysers in northern California or across much of Iceland, a developer drills into the reservoir and brings up steam or pressurized hot water.

Two plant designs convert that heat to electricity. A flash or dry-steam plant sends the geothermal steam directly through a turbine. A binary plant passes the hot brine through a heat exchanger that boils a secondary fluid with a lower boiling point, such as isobutane or pentane, and that vapor drives the turbine. Binary plants can use water as cool as about 100 to 150 °C, and most U.S. capacity built since 2000 is binary.

The requirement for natural water and permeability confines conventional geothermal to a small fraction of the land surface. U.S. installed geothermal capacity was 3.97 gigawatts (nameplate) at the end of 2024, nearly all of it in California and Nevada, and it supplies less than 1% of the nation’s electricity. Hot rock lies beneath every location; what most locations lack is the water and the open pathways to carry its heat to the surface.

How an Enhanced Geothermal System Works

An enhanced geothermal system (EGS) supplies the two missing ingredients by engineering. The operator brings the water and creates the permeability. The system runs as a closed loop:

  1. Drill an injection well into hot, low-permeability rock.
  2. Stimulate the rock around the well by pumping fluid at high pressure. The pressure opens existing natural fractures and creates new ones. Operators often add proppant (sand or ceramic grains) to hold the fractures open after the pressure is released.
  3. Drill a production well that passes through the same fractured volume, typically a few hundred feet from the injector.
  4. Pump water down the injector. It flows through the fracture network, takes up heat from the rock faces, and rises up the producer.
  5. Pass the hot fluid through a flash or binary plant to generate electricity.
  6. Reinject the cooled water to be heated again.

The two wells are not drilled into each other. The connection between them is the stimulated fracture network, and the engineering task is to make that network large enough to expose a wide area of hot rock, while avoiding a few dominant fractures that carry the water straight across without heating it.

The idea dates to the Fenton Hill experiment at Los Alamos in the 1970s. What changed in the past decade is the tooling borrowed from the oil and gas industry: polycrystalline diamond drill bits, directional and horizontal drilling, measurement-while-drilling instruments, and multi-stage hydraulic stimulation. Fervo Energy and Mazama Energy both adapted those methods, and both report large reductions in drilling time from one well to the next.

The Newberry Project

Newberry is a broad shield volcano in the Cascade Range south of Bend, Oregon, and it holds one of the largest known geothermal heat resources in the United States. Earlier EGS work took place there in 2012 to 2014 under a Department of Energy demonstration led by AltaRock Energy. Mazama Energy, a Texas company backed by Khosla Ventures and Gates Frontier and funded in part by a $20 million DOE grant, began its pilot at the site in late 2024.

The company reported the following results in October 2025, and its engineers presented the technical detail at the Stanford Geothermal Workshop in February 2026:

  • Injector. Mazama reworked and stimulated an existing well, 55-29, about 3,008 m (9,870 ft) deep, with a bottomhole temperature of 331 °C (629 °F).
  • Producer. It drilled a new deviated well, 55A-29, about 10,200 ft (3,100 m) along its path, and placed it within 6 feet of the planned trajectory.
  • Stimulation. It used a staged, propped fracturing method it calls Thermal Lattice. Its engineers describe the result as the first propped EGS doublet above 300 °C.
  • Circulation. Tests confirmed hydraulic connection between the two wells and heat recovery from the rock.
  • Equipment. The drilling crews logged more than 120 cumulative circulating hours above 300 °C with no failure of the downhole motor or measurement-while-drilling tools.

The 6-foot figure measures how closely the producer followed its designed path through the rock, at the end of a 2-mile bore steered by instruments alone. It does not mean the drill struck a target the size of a dinner plate, and the wells do not touch. Water passes between them through the stimulated fractures.

Mazama describes the system as the hottest engineered geothermal system ever built. Deeper and hotter wells have been drilled before, such as Iceland’s IDDP-2, which reached about 426 °C in 2017, but that was a single exploratory well, not a stimulated two-well circulation loop. The claim holds within that definition.

The 2026 campaign moved toward hotter rock. In September 2026 the company raised $135 million and reported that its second well, called Project Athena, reached the same 10,350-foot depth in 15 days, about 80% faster than the 2025 well, and was continuing about a mile deeper toward 400 °C (750 °F).

Why Temperature Governs Output

The electrical power from one production well is the product of three factors: the mass of water it delivers per second, the heat each kilogram carries above the reinjection temperature, and the fraction of that heat the plant converts to work. Hotter rock raises all three.

The conversion fraction is bounded by the Carnot limit, set by the absolute temperatures of the hot fluid and the cooling sink:

\eta_{\max} = 1 - \frac{T_{\text{cold}}}{T_{\text{hot}}}

Real plants reach well under half of this ceiling, because the fluid gives up its heat over a range of temperatures rather than all at the peak, but the ceiling rises with source temperature and real efficiencies rise with it.

The heat carried per kilogram rises faster still. Above 374 °C and 22.1 MPa, the critical point of water, the liquid and vapor phases merge into a single supercritical fluid. Supercritical water at 400 °C holds roughly three times the heat per kilogram of liquid water at 200 °C, and its viscosity is several times lower, so it flows through the same fractures at a higher rate.

Source fluid Heat above 25 °C (kJ/kg, approx.) Carnot ceiling with 25 °C sink
Liquid water, 200 °C (typical conventional) 750 37%
Liquid water, 331 °C (Newberry 2025) 1,420 51%
Supercritical water, 400 °C at 25 MPa (Mazama target) 2,470 56%

I computed the heat values from standard steam tables and the ceilings from the formula above. Higher heat per kilogram, higher conversion efficiency, and higher flow rate multiply together. That product is the basis for Mazama’s projection that a superhot well can deliver up to 10 times the power of a conventional 200 °C well, and for its related claims of up to 75% less water and 80% fewer wells for a given output. These are company projections for rock at about 400 °C. The 2025 system at 331 °C is below the superhot threshold, and no superhot EGS has yet produced commercial power.

Timeline and Scale

Newberry has produced no electricity yet. The 2025 work was a reservoir pilot that proved the rock could be fractured, connected, and circulated at 331 °C. Mazama’s published plan has three stages:

Stage Size Stated timing Status (November 2026)
Commercial pilot (Project Ceres, horizontal well pair) 15 to 20 MW First announced for 2026; now stated as 2027 Funded; drilling under way
First development 200 MW Development complete by about 2030 Permitted site; not yet built
Full site potential 5 GW (2025 estimate); later raised to as much as 10 GW Long term Company estimate

For scale, all U.S. geothermal plants together have about 4 GW of nameplate capacity. If the Newberry site reached its estimated potential, that one site would exceed the present national geothermal fleet. A 5 GW figure is a resource estimate, an upper bound on what the heat could support, not a schedule of construction.

Enhanced geothermal has already reached the grid elsewhere. Fervo Energy’s Cape Station in Beaver County, Utah, synchronized its first 33 MW unit on 24 September 2026 and declared commercial operation on 30 September 2026. Fervo plans two more 33 MW units by 1 January 2027 and another 400 MW by 2028, with about 900 MW of output under contract to buyers including Southern California Edison, Shell, and Google. Cape Station works in rock well below the 374 °C superhot threshold, so it demonstrates EGS at utility scale but not the superhot regime Mazama is pursuing.

Open Engineering Problems

The Newberry pilot answered whether a hot, connected reservoir can be built. Several questions remain before superhot EGS is a proven power source.

Thermal drawdown. The rock surrounding the fractures cools as water takes its heat, and conduction refills it slowly. Granite and basalt have a thermal diffusivity near 1 × 10⁻⁶ m²/s, so over 30 years heat diffuses inward only about 30 m (the square root of diffusivity times time). A well field therefore lasts as long as its stored heat, measured in decades, after which the operator drills new fractures into fresh rock. The heat of the planet is effectively inexhaustible on human time scales; the heat of a given well field is not.

Short-circuiting and water loss. If one fracture carries most of the flow, water crosses between wells too fast to heat fully and the output temperature falls. If fractures leak beyond the wellfield, the operator must make up the lost water. Spreading flow evenly across many fractures is the purpose of staged, propped stimulation.

Induced seismicity. High-pressure injection can slip existing faults. An EGS project in Basel, Switzerland, was halted after a magnitude 3.4 earthquake in 2006, and a Korean government commission linked a magnitude 5.4 earthquake in Pohang in 2017 to EGS injection there. Current projects use seismic monitoring and “traffic light” protocols that reduce or stop injection when tremors exceed set thresholds.

Materials at superhot conditions. Above 374 °C, cement, steel casing, drilling electronics, and seals all approach their limits, and supercritical water dissolves and carries minerals aggressively. Mazama reports proprietary high-temperature materials and drilling-fluid cooling for this regime; their long-term performance has not yet been published.

Cost. Mazama targets power below 5 cents per kilowatt-hour. That target depends on the projected gains in output per well, which remain to be shown in operation.

Corrections to the Video

The video’s account of the project is accurate in its main facts: the depth, the 629 °F temperature, the 6-foot placement, the successful circulation test, and the company’s stated plans. The following statements do not match the record.

Video’s statement The record
Rock at 629 °F is hot enough to melt lead, zinc, or aluminum. Lead melts at 621 °F, so 629 °F exceeds it by 8 degrees. Zinc melts at 787 °F and aluminum at 1,221 °F; Newberry’s rock is far below both.
The wells were connected “through the solid stone,” with the drill striking a target the size of a dinner plate. The wells do not meet. The producer was steered within 6 feet of its planned path, and water passes between the wells through a stimulated fracture network.
The plant could produce up to 10 times more power and use up to 75% less water than older methods. These are company projections for superhot rock near 400 °C. The 331 °C system built in 2025 is below that range and has not produced power.
The next step is a 15 MW demonstration plant. The 15 to 20 MW pilot, first planned for 2026, is now stated for 2027.
About two dozen wells and 200 MW by 2029. Recent reporting gives about 2030 for the first 200 MW development.
The plant runs “forever.” The planet’s heat is effectively inexhaustible, but each well field cools over decades and must be extended into fresh rock.
Hot rock lies beneath almost every spot, so a plant can be built almost anywhere. True in principle. Outside volcanic regions the needed temperatures lie two to three times deeper, which raises drilling cost; the economics of deep EGS in ordinary crust are not yet established.

Conclusion

Geothermal power has been limited by geology: it worked only where nature had already placed hot water in permeable rock. Enhanced geothermal systems remove that limit by supplying the water and fracturing the rock, and the physics of heat transfer favors the hottest rock available. At Newberry, Mazama Energy built and circulated a two-well reservoir at 331 °C, and in Utah, Fervo Energy is now selling enhanced geothermal power to the grid at 33 MW and building toward 500 MW.

The remaining steps are measurable. The 15 MW pilot will show whether superhot wells deliver the projected output per well. Years of operation will show how fast the reservoirs cool, whether induced seismicity stays within safe limits, and whether the cost reaches the target. If those results hold, geothermal can supply steady electricity, independent of weather and time of day, in many more places than it does now.